This building is connected to Hulin and Sanzhangli Power Substations to ensure power supply. There is a seismic isolation tube in the seismic isolation layer. Double-barreled and double-pumped generators are used to ensure 72 hours independent power supply. The fuel is stored in two tankers with a total volume of 60 liters. There are fuel pumps on the 1st, 2nd and 4th floors.